European Type Jaw Crusher is a new crushing machine, the jaw
Due to the increasing market demand for the scale, intensific
T130X Superfine Grinding Mill is a world leading tool for pow
MW Series Micro Powder Mill is a new superfine powder (325-25
K Series Portable Crusher Plant, also known as K Series Porta
S5X Series Vibrating Screen is of high vibration intensity. U
Due to the increasing market demand for the scale, intensific
T130X Superfine Grinding Mill is a world leading tool for pow
MW Series Micro Powder Mill is a new superfine powder (325-25
K Series Portable Crusher Plant, also known as K Series Porta
S5X Series Vibrating Screen is of high vibration intensity. U
Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.
Aug 03, 2018· Dry Volume of Concrete = 1 x 1.54 = 1.54 m 3 Sand= (1.5/5.5) x 1.54 = 0.42 m 3 ∴ 1.5 is a part of Sand, 5.5 is sum of ratio . Density of Sand is 1450/m 3. For KG = 0.42 x 1450 = 609 kg As we know that 1m 3 = 35.31 CFT. For Calculation in Cubic Feet = 0.42 x 35.31 = 14.83 Cubic Feet . CALCULATION FOR AGGREGATE QUANTITY
May 14, 2018· About 125 pounds of dry material is needed to make 1 cubic foot of concrete. A standard recipe for concrete is 1 part cement, 2 parts sand and 3 parts gravel. You will require about 20.8 pounds cement, 41.7 pounds sand and 62.5 pounds gravel. This is about 2 1/4
The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose
Feb 15, 2020· How Much Gravel do I Need Concrete is a mixture of sand, gravel, cement, and water. When wet, it can be formed in different ways. When it hardens or sets, it becomes like rock. It is used to bond bricks or stones, or to make walls, walkways, and sidewalks. The exact ratio of ingredients used confers its particular properties of concrete.
Sand calculator online estimate the sand required for your construction or landscaping project in weight (pounds, kilograms, tons, tonnes) and volume (cubic ft, cubic yards, cubic meters). If you are wondering 'how much sand do I need', our free sand calculator is here to do the math for you. Information about sand density, common sand types, sand grain sizes, how much a cubic yard of sand
These Concrete Calculators provide the required quantities of cement and all-in ballast or cement, sharp sand and gravel required to give a defined volume of finished concrete. Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete.
Imagine I am going to fill an area measuring 5 feet by 3 feet using standard sand. I want equal coverage to a thickness of 2 inches . The sand’s density is 100 lb/ft³ and costs $10 per ton.
Free gravel calculator online: estimate how much gravel you need for your construction or gardening / landscaping project in tons / tonnes or cubic yards, meters, etc. Calculates gravel required in volume: cubic feet, cubic yards, cubic meters, or weight: pounds, tons, kilograms, tonnes Gravel calculator with information about gravel density, common gravel sizes, how much a cubic yard of
Free online concrete calculator for your construction projects. Calculate the required weight and volume of readymix concrete you need for your wall, column, steps, slabs, footings, and others. Easy to use calculator for how much concrete you need in cubic feet, cubic yards, cubic meters, tons, tonnes, as well as bags of concrete of different sizes.
These Concrete Calculators work out the required cement and all-in ballast or cement, sharp sand and gravel required to complete a user defined volume of finished concrete. Both concrete calculators make an allowance for the fact that ballast etc losses volume when mixed to make concrete.
These Concrete Calculators provide the required quantities of cement and all-in ballast or cement, sharp sand and gravel required to give a defined volume of finished concrete. Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete.
Free online concrete calculator for your construction projects. Calculate the required weight and volume of readymix concrete you need for your wall, column, steps, slabs, footings, and others. Easy to use calculator for how much concrete you need in cubic feet, cubic yards, cubic meters, tons, tonnes, as well as bags of concrete of different sizes.
Jun 17, 2018· About 1 billion sands can fit in a cubic meter, 362 stones or 655 kg of cement Jk its imposibble to calculate as: sand and stone both come in different sizes; without knowing the size of the sand or stones in question, there is know possible answe...
For 10 square meters of concrete block wall, you would need 110 blocks, assuming a mortar bed depth of 10mm and with a mix of 1:5 cement: sand and 10% wastage you would need 1.225 cubic metres of mortar, which would require 0.245 cubic metres of cement and 1.225 cubic metres of sand (the cement sits in the spaces between sand grains and so does
Total Area = 1 cu.m %age of water = 22% wet quantity = 1 * 0.22 = 0.22 cu.m dry quantity = 0.22 * 1.27 = 0.2794 cu.m Ratio, Let’s say = 1 : 5 Sum of ratios = 1 + 5 = 6 Cement = ( 1 / 6 ) * 0.2794 = 0.167 * 0.2794 = 0.0465 cu.m < assuming each bags...
Imagine I am going to fill an area measuring 5 feet by 3 feet using standard sand. I want equal coverage to a thickness of 2 inches . The sand’s density is 100 lb/ft³ and costs $10 per ton.
Mix (as per concrete use) No. 20kg bags of cement cubic metres (m3) of sand cubic metres (m3) cement sand stone of stone 1 2 3 16 0.5 0.8 1 2.5 4 13 0.5 0.8 1 3 5 11 0.5 0.9 *Slab thickness in mm. 3. Decide whether to use: (a) Premix concrete from a readymix supplier (b) Bagged cement, sand and stone (c) Bagged concrete Estimating how much
The water cement ratio required for mixing of concrete is taken as 0.45. Assuming bulk densities of materials per cubic meter, cubic feet and cubic yards as follows: Cement = 1500 kg/m3 = 93.642 lb/ft3 = 2528.332 lb/cubic yards. Sand = 1700 kg/m3 = 105 lb/ft3 = 2865.443 lb/cubic
One popular formula for making concrete is the "1-2-3": 1 part portland, 2 parts sand, 3 parts gravel. A 94# bag of portland (approximately 1 cubic foot) would yield 6 cubic feet of concrete
When you increase thickness to 6 inches, one cubic yard of concrete covers an area of 52 square feet and 65 square feet with a thickness of 5 inches. When you want to have one cubic yard of concrete with strength of 4000 psi, you need to keep following ratios: Cement 611 pounds; Sand 1450 pounds; Stone 1600 pounds; Water 33 to
You can calculate the required volume of gravel by multiplying the gravel path area by the desired thickness: 23 yd² * 0.1 yd = 2.3 yd³. The last things to assess are the estimated weight of the required gravel and its cost. Knowledge about the weight of the cargo may come in handy when it comes to transportation.
Divide gravel cubic cm by 1,000,000 to find the volume of gravel in cubic meters; Multiply the area by the sand depth in centimeters to find the sand volume in cubic cm; Divide sand cubic cm by 1,000,000 to find how much sand is needed in cubic meters; How Deep Should a Paver Base Be? For a typical patio, a paver base should consist of a 4
Oct 01, 2009· An average 1:2:3 mix contains one part cement, two parts sand and three parts gravel. To make 1 cubic yard of concrete, you'd need seven 94-pound bags of cement, about 1/2 cubic yard of sand and
The water cement ratio required for mixing of concrete is taken as 0.45. Assuming bulk densities of materials per cubic meter, cubic feet and cubic yards as follows: Cement = 1500 kg/m3 = 93.642 lb/ft3 = 2528.332 lb/cubic yards. Sand = 1700 kg/m3 = 105 lb/ft3 = 2865.443 lb/cubic
For 10 square meters of concrete block wall, you would need 110 blocks, assuming a mortar bed depth of 10mm and with a mix of 1:5 cement: sand and 10% wastage you would need 1.225 cubic metres of mortar, which would require 0.245 cubic metres of cement and 1.225 cubic metres of sand (the cement sits in the spaces between sand
Therefore,Density of aggregate = 1450 1750 kg/ m 3 . Quantity of aggregate in cubic feet = 3 x 1.54 /5.5 x 35.3147 = 29.66 cu.ft. Water: For M20, 30 liters of water per 50kg cement . Total amount of water required = 30 x 403.2 / 50 = 241.92 litre. 8.064 bags of cement required for 1 cu.m of M20 grade concrete. 630 kg of Sand required
For example, 20.4 divided by 27 = .76 cubic yards of gravel for the 3-by-40-foot walkway. 4 Convert cubic yards to tons if you are buying gravel from a company that sells it in tons.
Then you need to know the proportion of the cement and sand in the mortar. Let’s assume out required mortar quantity is 100 cubic feet and the ratio of cement and sand in the mortar is 1:4. When we say the cement-sand ratio is 1:4, we mean that the mortar contains one part of cement and four parts of sand.
One popular formula for making concrete is the "1-2-3": 1 part portland, 2 parts sand, 3 parts gravel. A 94# bag of portland (approximately 1 cubic foot) would yield 6 cubic feet of concrete. 3
Knowing the weight of the materials and how much water to use should help you determine how much cement, sand, and stone to purchase to complete your project. For estimating purposes, you can make about 1 cubic yard of concrete with 5 1/2 94-pound bags of cement, 17 cubic feet of sand, and 18 cubic feet of gravel.
When you increase thickness to 6 inches, one cubic yard of concrete covers an area of 52 square feet and 65 square feet with a thickness of 5 inches. When you want to have one cubic yard of concrete with strength of 4000 psi, you need to keep following ratios: Cement 611 pounds; Sand 1450 pounds; Stone
If the mortar joints are taken out to about 3/4" depth, that puts us at about 0.01 cubic feet of mortar needed to tuckpoint 1 square ft. of brick wall; The math would lead you to believe that an 80 lb bag of mortar will allow you yo tuckpoint 70+ sq. feet
You can calculate the required volume of gravel by multiplying the gravel path area by the desired thickness: 23 yd² * 0.1 yd = 2.3 yd³. The last things to assess are the estimated weight of the required gravel
If I break that down to a cubic meter of concrete it equals: 1. Cement = 301.2 kg. 2. Stone = 978.1 kg. 3. Sand = 882.3 kg. How much water is needed to mix the concrete? The amount of water needed to mix the concrete will be determined by how "workable" or how "wet or dry" you want the concrete
Gravel Cost Per Square Foot. Gravel costs $0.50 to $2.50 per square foot on average when covering an area 12" deep (a cubic foot), depending on the type. Base gravel, crusher run, slate, shale, and crushed concrete are the cheapest at $0.50 to $1.50 per square foot, while colored and decorative gravel run $3 per square foot.. Return to Top. Gravel
How many bags of portland cement is needed to mix 1 cubic yds. One popular formula for making concrete is the "1-2-3": 1 part portland, 2 parts sand, 3 parts gravel. A 94# bag of portland (approximately 1 cubic foot
for 15MPa, as per Indian code, its mix ratio is 1:2:4, and for this mix, it is shown in the above table that, cement required is 310kg of cement or 6.2 number of bags of cement, 0.434 cubic meter of sand (FA) and 0.868 cubic meter of coarse aggregate or stone.